BEGIN:VCALENDAR
PRODID:-//Florida Municipal Power Agency //NONSGML Events //EN
VERSION:2.0
METHOD:PUBLISH
X-MS-OLK-FORCEINSPECTOROPEN:TRUE
BEGIN:VTIMEZONE
TZID:Eastern Standard Time
X-LIC-LOCATION:America/New_York
BEGIN:STANDARD
DTSTART:20211103T020000
RRULE:FREQ=YEARLY;BYDAY=1SU;BYMONTH=11
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
END:STANDARD
BEGIN:DAYLIGHT
DTSTART:20210308T020000
RRULE:FREQ=YEARLY;BYDAY=2SU;BYMONTH=3
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
END:DAYLIGHT
END:VTIMEZONE
BEGIN:VEVENT
CLASS:PUBLIC
DESCRIPTION: MinMax Technologies’ eSMART is an asset management, inspection, and meter exchange tool designed by utility industry professionals. It is a complete asset management and inspection system from power generation to meters at customer service points.
As a North American Electric Reliability Corporation (NERC) registered Transmission Owner (TO), Generator Owner (GO), and Distribution Provider (DP) you are required to comply with reliability standard PRC-005-6 Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance. The purpose of PRC-005-6 is to document and implement programs for the maintenance of all Protection Systems, Automatic Reclosing, and Sudden Pressure Relaying affecting the reliability of the Bulk Electric System (BES) so that they are kept in working order.
MinMax has created a connection between the Protection System Maintenance Program (PSMP) procedure for PRC-005-6 and its Asset Management and Inspection program called eSMART 9.1. The eSMART software from MinMax allows its compliance users to quickly set up their PSMP programs by following the guidelines from their enforcing regional entities.  eSMART allows PSMP to track Verification, Monitoring, Testing, Inspection, and Calibration. Using the asset management part of the eSMART program, the users can organize the PRC-005 Components and Component Types with eSMART’s Asset IDs and Equipment Types.  With eSMART’s Time-based and Performance (Condition)-based inspections, the users can perform numerous time-bound inspections (Requirements) on time while meeting the compliance due dates.  The various pieces of evidence required by PRC-005-6 can be comfortably furnished using the document management system of eSMART and its rich portfolio of easy-to-use predefined reports that are easily configurable for audit purposes
MinMax will be available after the training to speak with utilities.
DTEND;TZID="Eastern Standard Time":20230404T140000
DTSTART;TZID=Eastern Standard Time:20230404T100000
LOCATION:8553 Commodity Circle\, Orlando\, FL 32819
SUMMARY:PRC-005-6 MinMax eSMART Demonstration
PRIORITY:5
SEQUENCE:0
URL;VALUE=URI:https://fmpa.com/aci_events/prc-005-6-minmax-esmart-demonstration/
TRANSP:OPAQUE
X-MICROSOFT-CDO-BUSYSTATUS:BUSY
X-MICROSOFT-CDO-IMPORTANCE:1
END:VEVENT
END:VCALENDAR
