caneislandu4

Stanton 2 Project

The Stanton II Project is a 23.2% ownership interest in Stanton Unit 2, a 429 MW coal-fired power plant.

Members Entitlement in Megawatts3
Fort Pierce
16.4
Homestead 8.2
Key West
9.9
Kissimmee
32.9
St. Cloud
14.6
Starke
1.2
Vero Beach
16.4
Total Megawatts 99.6


3
Participants' capacity entitlements based on the unit's normal high dispatch limit, also known as maximum long-term rating, which indicates the unit's design capability. Actual output of the unit may vary based on operating conditions.

 

Plant Facts

  • Operator: Orlando Utilities Commission, the plant’s majority owner

  • Capacity: 429 MW

  • Location: Southeast Orlando

  • Commercial Operation: June 1, 1996

 

Stanton Unit 2 Owners
Ownership Interest
Orlando Utilities Commission 71.6%
Stanton II Project 23.2%
All-Requirements Project
5.2%