Stanton Project
The Stanton Project is a 14.8% ownership interest in Stanton Unit 1, a 425 MW coal-fired plant operated by Orlando Utilities Commission.
| Members | Entitlement in Megawatts3 |
| Fort Pierce |
15.4 |
| Homestead | 7.7 |
| Kissimmee |
7.7 |
| Lake Worth |
10.2 |
| Starke |
1.5 |
| Vero Beach |
20.5 |
| Total Megawatts | 63.0 |
3Participants' capacity entitlements based on the unit's normal high dispatch limit, also known as maximum long-term rating, which indicates the unit's design capability. Actual output of the unit may vary based on operating conditions.
Plant Facts
-
Operator: Orlando Utilities Commission, the plant’s majority owner
-
Capacity: 425 MW
-
Location: Southeast Orlando
-
Commercial Operation: July 1, 1987
| Stanton Unit 1 Owners |
Ownership Interest |
| Orlando Utilities Commission | 68.6% |
| Stanton Project | 14.8% |
| All-Requirements Project |
6.5% |
| Tri-City Project |
5.3% |
| Kissimmee Utility Authority |
4.8% |